Free site assessment for commercial, industrial & government projects
EPC step 03

Construction

Our site teams turn the design into a working plant. Work is planned in stages, supervised by experienced engineers and carried out with safety first at every step.

What’s included

Civil & structural works

Foundations, piling, module mounting structures, cable trenches, inverter rooms and drainage – built to the approved drawings.

Electrical installation

Module mounting and stringing, DC and AC cabling, inverter and transformer installation, earthing and lightning protection.

System integration

Integration with your existing electrical network, monitoring systems and, where required, the switchyard and grid connection.

Site safety & quality control

Daily toolbox talks, PPE enforcement, stage-wise quality checks and documented inspections before each milestone.

What you get

  • Clean, well-documented installation
  • Minimal disruption to your operations
  • Timely project delivery
Ready when you are

Let’s power the future together

Share your site details and electricity bills. We will come back with a design, generation estimate and a Captive vs RESCO comparison.